
Waterways Ireland is in the process of revising its Byelaws. The previous ones were passed in 1988 more than 30 years ago so a revision has been long overdue. The proposed Byelaws are arranged in some 40 sections. Most of the changes affect the boating fraternity but buried deep in the document is a clause which is aimed at cyclists.
Under Section 35 Protection of biodiversity, water quality, heritage, environment and prohibited activities, Waterways Ireland includes subsection (10) Prohibited Activity on canal property. The subsection refers to bicycles and powered personal transporters in two clauses
No person shall
(m) Use any bicycle, tricycle or powered personal transporter in a manner that endangers causes a nuisance to themselves and other users of any greenway.
(n) Exceed a speed of 15 kilometres per hour on any bicycle, tricycle or powered person transporter while using any greenway.
Maynooth Cycling Campaign has no issue with the first subclause. However, we strongly oppose the proposal to introduce a speed limit for cyclists on any Greenway or Blueway under the control of Waterways Ireland.
- The general design speed for greenways is 30 km/h (ref TII Rural Cycleway Design (2022).
- A bicycle is not legally obliged to have a speedometer. Therefore there is no way for a cyclist to know if he or she is travelling above or below a specific speed.
- The introduction of such a proposal would discourage cyclists from using a greenway or blueway, and cause them to divert them to trafficked roads. Introducing such a proposal at a time when road fatalities are increasing sharply is wholly irresponsible.
- Extreme weather events are worsening as a result of climate change. The result of suppressing the number of cyclists using the greenways and blueways will be to make it harder to meet our international obligations to reduce carbon emissions by 50% by 2030.
- Internationally, many adult utility cyclists in urban areas travel in excess of 15 km/h. Imposing a limit of 15km/h for cyclists in rural areas in the vicinity of few other users is therefore ridiculous.
- There is no speed limit on equivalent cycle facilities internationally. The introduction of such a speed limit would be to discourage international (as well as local) touring cyclists from using greenways along canals and waterways. This would reduce the potential financial benefits to adjacent businesses.
Waterways Ireland claims that the revisions were introduced following research and consultation with key stakeholders. Certainly Maynooth Cycling Campaign was not consulted and neither was our parent body Cyclist.ie who, for many years, has campaigned for development of the Royal Canal as part of the trans-national EuroVelo Route 02 the Capitals Route which runs from Moscow to Galway.
Waterways Ireland should be encouraging cyclists instead of discouraging them. Waterways Ireland is noted for an ambivalent attitude to cyclists. Cyclists are potentially a greater source of income than walkers or boaters on many waterways but Waterways Ireland want to provide low quality cycling infrastructure. This was demonstrated by their provision of kissing gates in the past. It is demonstrated by the large number of substandard gates provided between Leixlip and Kilcock. This has been repeated with the barriers on the Royal Canal at Louisa Bridge where the openings arer 1.3m and 1.0m. It is hardly rocket science. They just need to provide bollards at 1.5m spacing to enable all types of cycles but instead of learning from their mistakes, Waterways Ireland insist on repeating them.
The closing date for submissions on the ByeLaws was the 2nd October but Waterways Ireland has extended the date for submissions until 27th October so there is still time to make your views known. To be fair to them, Waterways Ireland has announced that they will be having discussions with Cyclist.ie.